Ready-to-use site : land of 50 ha for green industry project
On the map
Description :
Ready-tu-use site : land of 50 ha for green industry project cconsisting of plots of 10h with industrial building of 4000m2.
A former military base, all environmental studies of preventive archaeology, site delineation and demolition work and development of various roads and networks were carried out upstream.
The site is accessible by rail (Dijon/Luxembourg axis) and by road without urban crossing.
Full availability for 2025
Download complete file
More informations by downloading the file
Fields followed by a * are mandatory
Add this file to my favourites
Add this record to your favorites and download a global pdf file gathering all the offers you selected
Other properties that might interest you
Land in the logistics and industrial hub Eurotransit – Moselle
Description :
Land of 20ha available within the logistics and industrial hub Eurotransit in Moselle / ZAC of Fontaine des Saints – Les Jonquières Less than 15 km from Metz. Less than…Land within the Composite Park – Porcelette (Moselle):*
Description :
Land of 3 ha available and 7. 5 ha under development in the composite park of Porcelette (Moselle). A technology centre dedicated to composites and plastics. Located in the heart…